Quote: complete bathroom renovation
E.g.: full renovation, 3D floor plan, floor to ceiling

Supply dimensions, photographs, drain locations and a list of retained or replacement fixtures. State layout changes, whether this is the only bathroom and any adaptation needs. Request inspection before committing to concealed work.
Describe the intended result
State priority uses, fixtures, storage and movement needs. Show existing layout and wishes separately. Confirm levels, drainage and service access before choosing a layout.
Assign each trade’s task
Identify responsibility for design, plumbing, electrics, ventilation, waterproofing and finishes. Name the coordinator and checks before concealment. Buildwise highlights advance planning of watertight shower-tray junctions.
Organise work in an occupied home
Describe access, floor, lift, storage and available sanitary facilities. Clarify interruptions, protection, waste and unavailable periods. Confirm scheduling after checking supplies and installation requirements.
Set boundaries before quoting
Disclose known leaks or damp. Request assumptions about concealed substrates and the variation procedure after removal. Distinguish owner or joint-owner consent and any necessary municipal procedures.
Plan the handover file
Request operating tests, references, instructions, pipework photographs and care guidance. Clarify how outstanding items and follow-up responsibility are recorded. Define installation and service responsibility for equipment you buy directly.
Indicative prices in Luxembourg
On quotation
Cost follows the scope actually renewed: removal, substrates, services, waterproofing, finishes and equipment. Compare these items and exclusions rather than an isolated area rate. No local average is established without dated quotations of comparable scope.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Does the plan need to be three-dimensional?
A legible dimensioned plan can be sufficient; it must show useful levels, connections and access.
Is everything necessarily replaced?
Describe and inspect retained items. Complete does not define scope by itself.
Does a double basin need two independent drains all the way to the stack?
Have connections and capacity assessed; basin count alone does not prescribe the entire network.
Is financial support automatic?
No. Work, property and household circumstances require assessment under the relevant scheme.