Quote: garden creation
E.g.: landscape design, 3D garden plan

Describe how you want to use the garden and the time available for upkeep. Add plans, photographs, access and features to retain. Request separate design, construction and aftercare scopes: they are not automatically combined in every offer.
Describe priorities
Specify dining, play, food growing, parking, shade and privacy. Mention access, pets and circulation. Separate essentials at delivery from later wishes. A style reference does not justify identical plants on different ground.
Define the design commission
Request survey, dimensioned layout, planting selection, construction details and included alternatives. A visualisation cannot replace setting-out and level information. Assign boundary, service, water and procedure checks and identify separate studies.
Select suitable planting
The environment portal highlights native hedges as wildlife habitat. Request a selection justified for soil, exposure and space, with mature dimensions and care. A style label cannot guarantee an easy-care garden.
Define construction and aftercare
Specify access, storage, retained-feature protection and sequence. Request postponement conditions, handover documents, watering instructions and a contact after delivery. Record replacement terms; a plan cannot guarantee establishment.
Indicative prices in Luxembourg
On quotation
Compare the same programme and drawing. Itemise studies, ground preparation, plants, structures, equipment and care. Garden area alone determines neither a complete price nor an automatic size discount.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Is a visualisation compulsory?
Define useful deliverables for the project rather than a universal area threshold.
Is a Japanese garden low-maintenance?
Style alone does not determine this. Ask for care tasks for the proposed plants and materials.
Can existing trees remain?
Assess condition, constraints and construction protection before fixing the layout.
Are applications included?
Identify who establishes requirements, prepares files and handles remaining owner tasks.