Quote: roof maintenance and inspection
E.g.: annual roof inspection, preventive maintenance contract

State roof type, access, equipment and previous work. Specify inspection, drain cleaning or repairs. A condition visit and moss removal serve different needs; write down tasks and expected deliverables.
Adapt the programme
Buildwise recommends regular flat-roof maintenance with visits associated with winter and leaf fall. Use this as technical guidance for discussion, not a universal Luxembourg obligation. Set the programme by system, exposure, equipment and instructions.
Define inspection boundaries
List surfaces, visible fixings, junctions, drains and attic-accessible parts. Identify omissions and reasons. Visual inspection without opening does not certify every layer or structural capacity.
Avoid automatic cleaning
For slate, CUPA describes access risks and cleaning limits: plant deposits may return. Confirm need and compatibility with covering, junctions and equipment. Do not climb onto the roof or treat suspect material before identification.
Receive a usable report
Request areas, photos, defects, completed work and prioritised recommendations. Separate included repair, extra quote and monitoring. Keep reports to track change and inform future contractors.
Plan exceptional events
Clarify action after storm, leak or another trade’s roof visit. A maintenance contract guarantees neither no leaks nor permanent call-out cover. Confirm contact, availability and extra-visit costs.
Indicative prices in Luxembourg
On quotation
Compare agreed frequency, scope, access, report and included work. Define minor repairs by type and limits rather than a package name. No visit price or avoided-damage saving is established without comparable observations.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Does inspection include cleaning?
Only if specified. Name tasks and limits.
How often?
Agree a programme based on materials, exposure and instructions, plus triggers for additional checks.
Does clean mean sound?
No. Appearance does not establish fixing, junction or concealed-layer condition.
Does a contract cover every leak?
Not by default. Check services, exclusions and attendance terms.