Quote: prefabricated timber truss roof

State whether the roof space stays unused or serves a defined purpose. Provide plans, supports, covering, ceiling, insulation and openings. The manufacturer needs the complete project; changes after manufacture may require reassessment.

Choose for the intended loft use

CODIFAB distinguishes trusses for unused roof space and configurations for habitable lofts. Trusses therefore do not rule out conversion; the selected design matters. Specify space and loads without equating a raised ceiling with a habitable floor.

Supply information before manufacture

Identify stairs, windows, ducts, equipment and already planned future changes. Request the assumptions requiring confirmation before production. Coordinate masonry and other supports; delivery matching an incomplete drawing may still miss the actual project needs.

Receive a documented package

Request member identification, erection drawings and a delivery list. Assign design, manufacture, site receipt and installation to identified parties. Agree handling of transport-damaged members before incorporation.

Plan stability during and after erection

Specify lifting arrangements and temporary then permanent stability measures. Agree checks before connections are concealed. A delivery schedule does not itself confirm that site conditions allow installation.

Control later alterations

Do not cut a member for a duct or access opening. Have changes assessed and keep updated records. Before storage or conversion, check approved use: empty roof space is not permission to add loads.

Indicative prices in Luxembourg

On quotation

Compare a complete delivered and installed frame, including design, connecting components, bracing and anchors. Separate transport and lifting, then roofing and interior conversion. Prices for trusses alone cannot compare completed buildings.

See the full price breakdown — ranges, cost breakdown, real examples

Subsidies and grants

No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.

Frequently asked questions

Do trusses always prevent a habitable loft?

No. The configuration must suit the intended use and the conversion must be assessed.

Can I cut an obstructing diagonal?

No. Have the adaptation assessed before changing anything.

Does a raised tie create a floor?

Do not assume so. Clarify geometry, use and allowable project loads.

Is installation guaranteed within a few days?

Request a schedule covering manufacture, ready supports, delivery, lifting and site conditions.