Installing a stairlift: decisions to confirm at each stage

Published on 31 July 2026 · Verified on 18 September 2026 · The Mestravaux.lu team

Installation timing depends on the chosen project, survey, any administrative route and equipment availability. Request a schedule with conditions for moving between stages. A fitting duration does not necessarily cover the whole project.

The essentials in 30 seconds

  • Describe use before fixing the configuration.
  • Confirm survey, funding and permissions before ordering.
  • Plan checks, demonstration and aftercare before first use.
Installing a stairlift: decisions to confirm at each stage

Prepare the first conversation

Describe levels, stairs, difficulties and other occupants. Photos help prepare a survey but cannot alone prove feasibility. If urgent, request a confirmed date and discuss interim arrangements with those supporting you.

Déroulé et délais d'une installation de monte-escalier
ÉtapeDélaiCoût associé
Visite techniqueSous 1 semaine après contactGénéralement gratuite
Devis et choix de configuration2 à 5 jours après la visite3 500 – 15 000 € selon configuration
Fabrication du rail (droit)1 à 2 semainesInclus dans le devis
Fabrication du rail (tournant)3 à 4 semainesInclus dans le devis
Pose sur site et mise en serviceDemi-journée à 1 jourInclus dans le devis
Entretien annuel1 à 2 visites par an150 – 300 € / an

Délais indicatifs pouvant varier selon le carnet de commandes de l'installateur, notamment en haute saison.

Survey the complete route

Record steps, turns, landings, headroom and parking. Stannah distinguishes these by configuration. Show unfolded equipment, boarding movements and remaining passage. Mention planned stair or floor work.

Confirm offer and ordering route

Identify equipment, rail, options, preparation, fitting and aftercare. Under care insurance, AEC reviews quotes before decision and mandate; CNS orders through that route. Requesting an offer is not permission to order.

Confirm preparation and schedule

Ask dates or prerequisites for final survey, manufacture, delivery, electrical preparation and fitting. Identify who prepares supports and access. Approve configuration changes before execution; AEC’s selected configuration cannot be changed without its agreement.

Your project deserves an accurate estimate — it's free.

Request a quote

Organise fitting and acceptance

Describe fixings, protection, connections and making good. AEC provides for acceptance by an approved body arranged by the contractor. Confirm required checks and when use may begin instead of assuming it starts when the installer leaves.

Learn operation and arrange aftercare

Request a demonstration adapted to user and assistant, instructions, use limits and action if stopped. Identify maintenance, inspections, support and charges. Do not bypass safety devices to restart equipment.

Frequently asked questions

Is the survey free?

Confirm terms before the appointment. Free visits are not assumed for every business.

How long from ordering to use?

Request a schedule for equipment, work and checks. No universal deadline is established.

Is the stair never drilled?

Do not assume so. Request fixing details and effects on the supports.

What if the project changes?

Tell the business before manufacture and relevant authorities before changing an approved configuration.