Apartment renovation costs: access, utilities and finishes

Apartments with the same floor area may require different work. Separate work in your unit, interventions affecting the building and access logistics when comparing offers. We do not have a verified local average to apply to your floor area.

Editorial update on 18 September 2026

Indicative average price

according to the agreed work

Entry level
High end
Get my quotes
Apartment renovation costs: access, utilities and finishes

Define private work and shared-service interfaces

Identify where each service ends: a connection inside the apartment, shared riser, ventilation or external element. The housing ministry describes general-meeting decisions for work affecting common parts or the building’s appearance. Ask the managing agent which decision your project needs; their coordination role does not replace this check.

Have access inspected before comparing totals

Provide the floor level, usable passage dimensions and delivery arrangements. Agree on protection, storage and waste removal with the contractor and building management. Request a description of access equipment and its hire period rather than adding an assumed flat surcharge.

Describe equipment relocations

For a relocated kitchen or bathroom, ask how connections will be assessed and what can stay. For new flooring, specify the substrate, preparation and proposed acoustic solution. Choosing a finish from a catalogue does not define this work.

The three budget levels

Where your money goes

  • Protection and accessBy quotationClarify deliveries, routes, retained areas and cleaning.
  • Utilities and wet roomsBy quotationDefine connection points and boundaries with shared equipment.
  • Floors, walls and internal fittingsBy quotationCompare substrate preparation, areas and selected products.
  • Coordination and other expensesBy quotationIdentify visits, building-management discussions and any storage or temporary accommodation.

What makes the price vary

  • Floor level and passages

    Confirm the handling equipment actually needed.

  • Relocating wet rooms

    Separate reused connections from routes still needing assessment.

  • Substrate condition

    Distinguish visible findings from checks after removal.

  • Building interventions

    Clarify who orders, authorises and pays for the work involved.

Indicative scenarios

    If considering a grant, identify the scheme and check the work, your circumstances and preliminary procedures. A quote request does not confirm eligibility.

    Frequently asked questions

    Is the managing agent’s agreement enough?

    Do not assume so. Identify affected parts and required decisions using the governing rules and project details. Any municipal procedures are a separate question.

    Does the apartment’s age require full electrical replacement?

    Age alone does not describe its condition. Request an assessment of the project and necessary adaptations rather than inferring complete replacement from the construction year.

    How can I compare different protection arrangements?

    Specify the areas protected, installation, upkeep and making good. Align scopes before comparing amounts.

    What duration should I allow?

    Request a schedule after assessing the apartment and building constraints. No universal meeting or construction duration is established here.