Cost: plasterboard partition
Compare a complete partition of equal length and height with both faces and matching options. Clarify measurement conventions to avoid counting area twice. No Luxembourg average is stated without dated comparable quotations.
Editorial update on 19 September 2026

Set the comparison unit
Ask whether partition area measured on one face includes both linings or each side is charged separately. Define openings, returns and heights. Then compare totals for the same plan rather than square-metre rates based on different measurements.
Distinguish actual options
Separate doorset, reinforcement, electrical equipment, insulation and finish. State base-system inclusions. A thicker or extra board alone establishes neither a fixed premium nor whole-room acoustic performance.
Plan reinstatement and schedule
Include floor junctions, skirting, painting, access, protection, disposal and taxes as applicable. Request assembly and drying stages before finishing. No universal two-day duration or small acoustic premium is assumed.
The three budget levels
Where your money goes
- PartitionOn quotationDefined assembly and both faces.
- OpeningsOn quotationDoor and passage finishing.
- EquipmentOn quotationAgreed supports and services.
- FinishOn quotationJointing, preparation and painting.
What makes the price vary
Plan
Length, height and openings.
Use
Sound, moisture and loads.
Interfaces
Floor, ceiling and adjoining walls.
Finish
Covering and intended light.
Indicative scenarios
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Does double boarding guarantee quiet?
No. Check the complete system and sound paths through doors, junctions and adjacent walls.
Is painting included?
Only if stated. Distinguish jointing, preparation and painted finish.
Can heavy furniture be hung?
Have supports and fixings designed for the furniture and partition before closing.
What thickness is needed?
That of the assembly selected after assessing height, performance, equipment and project constraints.
Your exact price, in 2 minutes
Describe your project, receive quotes from tradespeople in Luxembourg — free, with no commitment.