MestravauxYour projects, our experts
AI

Quote: house extension

E.g.: conventional masonry extension

Quote: house extension

Describe the intended use, such as living room, bedroom or kitchen, and its connection to existing rooms. Supply available plans, proposed position and safely taken site photos. Assess both the new volume and changes it brings to the existing house.

Check possibilities before design

Luxembourg City lists extensions as requiring building permission. Confirm footprint, height, boundaries, documents and additional opinions with your municipality. Small area does not automatically allow a simple notification.

Assess the junction

Have foundations, walls to be opened, floor levels and roof connections assessed. Request insulation, airtightness and water-management details. Matching existing insulation thickness is not a complete solution.

Define services

Specify heating, ventilation, sockets, lighting and any water supply or drainage. Check existing network capacity and suitability. A new kitchen and storage room require different services; area alone cannot compare their costs.

Plan work near occupants

Ask about building the extension before opening the house, restricted areas, protection and service shutdowns. Remaining at home must be confirmed against works and access. Plan alternatives if kitchen, bathrooms or routes are unavailable.

Indicative prices in Luxembourg

On quotation

Separate new construction, opening to the house, roof and facade junctions, services and making good. A square-metre price does not describe those interfaces. No universal premium over new build or area discount is established.

See the full price breakdown — ranges, cost breakdown, real examples

Subsidies and grants

Separate new space and any renovation of the existing building. Verify the scheme and eligible project scope before counting funding. An insulated extension alone does not establish Klimabonus entitlement.

Frequently asked questions

Must heating be enlarged?

Assess needs and the installation. No automatic replacement or supplement is assumed.

Must materials match?

The authorised project and technical details determine choices, not appearance alone.

Can I remain at home?

Confirm safe routes, separation and usable services at each stage.

Should the garden be included?

Separate reinstatement after work from new landscaping; explicitly include or exclude each.

In the same category