Quote: interior strip-out
E.g.: full strip-out before renovation

Strip-out prepares a defined renovation area; it does not require removing everything. Inventory retained, carefully dismantled and discarded items room by room. Keep structural alterations and hazardous-material work distinct.
Mark removal boundaries
Map partitions, finishes, ceilings, equipment and services. Confirm structural and shared elements to preserve. For salvage, specify ownership, condition, storage and destination; removed items are not automatically reusable.
Identify materials first
ITM highlights asbestos identification before affected work and explains new requirements with transition periods. Check the rules for the work date. Appearance or building age is not an absence certificate.
Prepare isolation
Have competent trades identify and safely isolate services. Protect areas remaining operational. Removing equipment is not the same as safely disconnecting its supply.
Organise materials and waste
AEV describes material inventories and separate collection in dismantling planning. Assign preparation and updating of project information and request evidence of chosen destinations.
Inspect after removal
Arrange inspection of exposed substrates and installations before following work. Document discoveries and approve design changes. Strip-out alone does not certify whole-building compliance.
Indicative prices in Luxembourg
On quotation
Tie pricing to the inventory and expected condition after removal. Home floor area does not measure waste volume. Compare quantities, access, sorting and destinations without assuming disposal is included.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Remove everything before renovation?
No. Define necessary removal and suitable retained elements.
Is asbestos removal included?
Do not assume it. Identified materials need appropriate scope and organisation.
What about a suspicious discovery?
Suspend work in the area and assess before restarting. Do not mix suspect material with ordinary waste.
Is a square-metre rate enough?
Only with a detailed inventory and inclusions. Equal-sized homes can require different removal work.