Quote: PVC window replacement
E.g.: Complete triple-glazed PVC window replacement, renovation installation on a house from the 1980s.

Send an opening list, frame photographs and comfort or usage priorities for PVC window replacement. Identify retained shutters and trims. The contractor must confirm dimensions, fitting method and model characteristics before ordering.
Describe each opening
Provide a reference, indicative measurements, opening type and interior/exterior photos. Specify both face colours, handles, desired glazing and retained equipment. Flag damage, damp or closing difficulties for assessment without preselecting installation on the old frame.
Request identified performance
Buildwise distinguishes Ug for glass, Uf for frames and Uw for windows. State each value’s scope in the offer; a glazing sheet does not describe the entire PVC window.
Prepare fitting and junctions
Clarify frame retention, removal and junction work. Specify shutter housing, sills, ventilation and finishes. Compare variants with equivalent outcomes rather than supply alone against completed work.
Check procedure and handover
Guichet distinguishes Klimabonus routes by renovation project. Check the scheme and steps before counting support. Request a proposed schedule, home protection, handover and maintenance instructions.
Indicative prices in Luxembourg
On quotation
Separate each PVC window, options, removal, fitting and finishes. Add shared work and shutter or ventilation adaptations. We have no dated, comparable quote sample supporting a Luxembourg average.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Is PVC always cheapest?
Compare equivalent models and services. No price ranking is established here.
Does triple glazing guarantee a grant?
No. Have the project’s technical and procedural conditions checked.
Can the old frame stay?
Assess condition and proposed fitting compatibility, including final passage and glass area.
What timing should I expect?
Request a dated schedule for survey, manufacture, fitting and finishes. No general duration is guaranteed.