Quote: entrance door
E.g.: Front door replacement with decorative glazing and reinforced thermal insulation.

Describe the current entrance, everyday problems and parts to retain. Add photos of the door, threshold and surroundings. State opening direction, passage needs and planned floor works before the contractor takes measurements.
Specify the complete configuration
Identify leaves, side panels, fanlight and glazing. Bel’M’s Harricana sheet illustrates configurations and separates thermal, acoustic and locking characteristics. These concern that model: request data for your configuration instead of extending them to every aluminium door.
Check passage and threshold
Have usable passage, handle clearance and finished-floor junction surveyed. Ask how the threshold and connections will work in your situation. An accessibility marketing statement does not replace a project check.
Separate locking from performance
Identify lock, cylinder, supplied keys and any electrical controls. For documented burglary resistance, request classification and its scope. A count of locking points does not replace that evidence.
Organise installation
Describe removal, protection, fitting and internal/external finishes. Agree how the entrance will remain secure during work and confirm timing after survey. Request operating, maintenance and product warranty documents.
Indicative prices in Luxembourg
On quotation
Compare the same installed assembly: door, frame, optional glass, hardware, threshold and connections. Separate appearance options, locking and finishing work. No local average, production time or standard-size discount is assumed without comparable offers.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Is every door made to measure?
Check achievable dimensions and model configuration. No universal size or automatic saving is assumed.
Does multipoint locking prove a resistance class?
No. Request evidence for the proposed assembly.
Does fitting take half a day?
The contractor must confirm the schedule after assessing removal and connections.
Does a window grant cover my door?
Do not assume so. Check the scheme, eligible equipment and application conditions.