Cost: additional storey

Alterations to the existing building influence the budget alongside the new storey. Separate studies, defined work and provisional allowances. A square-metre rate does not show whether supports, stairs or making good below are included.

Editorial update on 19 September 2026

Indicative average price

according to assessed scope

Entry level
High end
Get my quotes
Cost: additional storey

Separate studies from construction

Identify surveys, investigations, design and procedures. List unresolved decisions and how newly discovered work will be priced. A strengthening allowance is not a fixed price.

Compare the same completion level

Itemise structure, roof work, facade, windows, insulation, stairs, equipment and finishes. State the reference area and making good below. Compare the same room programme rather than only square-metre rates.

Include temporary works

Check scaffolding, lifting, protection, storage, disposal and cleaning. Allocate costs of postponement, extended protection and temporary accommodation. Request taxes, exclusions and the approval process for changes.

The three budget levels

Where your money goes

  • StudiesOn quotationExisting building, design and investigations.
  • StructureOn quotationStorey, supports and defined alterations.
  • EquipmentOn quotationStairs, services and finishes.
  • SiteOn quotationProtection and temporary facilities.

What makes the price vary

  • Existing building

    Capacity and condition to assess.

  • Roof

    Assessed retention or alteration.

  • Access

    Stairs and lifting arrangements.

  • Occupation

    Separation and work stages.

Indicative scenarios

    Classify work on the existing building and creation of new space before estimating aid. Do not deduct unconfirmed amounts.

    Frequently asked questions

    Must foundations always be strengthened?

    The building and project assessment determines this. Assume neither automatic strengthening nor no work.

    Does timber avoid assessment?

    No. Material choice does not confirm supports or connections.

    Can the current roof remain?

    Some projects can retain part of it; assess the construction approach instead of assuming complete removal.

    Can we stay at home?

    Confirm which stages allow occupation and which need an alternative, considering safe access, protection and available services.