Cost: retaining wall and gabions

The budget covers a structure designed for a specific situation, not just its visible face. Separate design, preparation, foundations, structure, water management and reinstatement. A square metre rate is comparable only when its reference area, wall geometry and included work match.

Editorial update on 19 September 2026

Indicative average price

according to selected work

Entry level
High end
Get my quotes
Cost: retaining wall and gabions

Clarify units

Where square metres are quoted, identify visible face or other measurement basis. Also specify length, changing heights and thickness or footprint. Stone and fill require quantities with their own units. Equal face area does not mean equal material volume.

Expose buried work in the quote

Separate design, setting out, excavation, spoil handling, foundations, backing preparation and water management, including the planned discharge point. Identify variation terms if encountered ground differs from documented assumptions.

Compare finished work

Include delivery, lifting, assembly or masonry, backfilling, finishing and access reinstatement. Separate any fall protection and landscaping. A cheaper alternative must meet the same retaining task and constraints with corresponding documents.

The three budget levels

Where your money goes

  • DesignOn quotationSurvey, ground information and sizing.
  • PreparationOn quotationExcavation, spoil and site access.
  • StructureOn quotationSupports, structure and fill or masonry.
  • Water and finishingOn quotationWater management and reinstatement.

What makes the price vary

  • Ground

    Levels, soil and water.

  • Loads

    Present and future uses above.

  • System

    Dimensions, footprint and materials.

  • Site

    Handling and neighbouring property.

Indicative scenarios

    No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.

    Frequently asked questions

    Compare the square metre rate alone?

    No. Align reference area, geometry, design and work through reinstatement.

    Are investigations included?

    Identify their author, scope, deliverables and price line.

    Can I remove drainage from the price?

    Request a complete water strategy; do not delete specified water management simply to reduce the total.

    Is facing stone included?

    Specify reference, quantity, supply and placement of facing or filling and the other materials.