Cost: shutter and gate painting
Count leaves, dimensions, faces, edges, slats and accessories. Separate preparation, repairs, finish and removal. No local unit price is established here; obtain surveys and quotes against the same inventory.
Editorial update on 19 September 2026

Define each unit
A shutter may mean one leaf or a pair. Record dimensions, one or both faces, edges, louvres and hardware. For gates separate leaves, pedestrian gate, posts and exclusions. Apparent area may understate work around slats and bars.
Separate painting and repairs
Itemise coating preparation, timber or metal repairs, hardware, any primer and finish. Record inspection reservations. Compare site and workshop options only where both suit the project.
Include removal and recommissioning
Request transport, protection, access, removal, refitting, adjustment, cleaning and waste. Identify motor-related work and who performs it. Specify taxes by item and exclusions; do not assume one reduced rate for building shutters and an external gate.
The three budget levels
Where your money goes
- InventoryOn quotationLeaves, dimensions and faces.
- PreparationOn quotationOld coating and substrate.
- RepairsOn quotationWeakened parts and hardware separately.
- WorkOn quotationAccess, removal, finishing and checks.
What makes the price vary
Material
System and compatibility.
Geometry
Slats, bars and profiles.
Condition
Preparation or prior repair.
Operation
Removal and any motorisation.
Indicative scenarios
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Can all PVC shutters be painted?
Do not assume so. Check material, condition, permitted colour and system with the manufacturer.
Can paint repair a perforated gate?
No. Assess integrity and repair before finishing.
Is separate anti-rust primer always necessary?
It depends on system and substrate. Request the complete specification.
How many years between repainting?
Follow observed condition, exposure and product instructions; no universal interval is established here.
Your exact price, in 2 minutes
Describe your project, receive quotes from tradespeople in Luxembourg — free, with no commitment.