MestravauxYour projects, our experts
AI

Cost: entrance door

Compare the same installed assembly: door, frame, optional glass, hardware, threshold and connections. Separate appearance options, locking and finishing work. No local average, production time or standard-size discount is assumed without comparable offers.

Editorial update on 18 September 2026

Indicative average price

according to assessed scope

Entry level
High end
Get my quotes
Cost: entrance door

Compare identical assemblies

Request reference, dimensions, solid or glazed composition, colours and accessories. Price side panels or fanlights as configured rather than comparing them with a simple door without adaptation.

Separate surrounding works

List frame removal, disposal, masonry repairs, floor junctions and painting. Identify electrical work for motorised locking and who performs it.

Read the total and its conditions

Check taxes, delivery, fitting, options and exclusions. A manufacturer’s supply-only price in another country is not an installed Luxembourg budget. Confirm any grant and eligibility before deducting it.

The three budget levels

Where your money goes

  • AssemblyOn quotationSelected leaf, frame and glass.
  • EquipmentOn quotationLocking, handles and keys.
  • InstallationOn quotationRemoval, fixing and connections.
  • FinishesOn quotationAffected floor, masonry and surfaces.

What makes the price vary

  • Composition

    Leaves, glazing and fixed panels.

  • Existing condition

    Support, dimensions and threshold.

  • Use

    Passage and locking controls.

  • Options

    Finish and documented performance.

Indicative scenarios

    No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.

    Frequently asked questions

    Is every door made to measure?

    Check achievable dimensions and model configuration. No universal size or automatic saving is assumed.

    Does multipoint locking prove a resistance class?

    No. Request evidence for the proposed assembly.

    Does fitting take half a day?

    The contractor must confirm the schedule after assessing removal and connections.

    Does a window grant cover my door?

    Do not assume so. Check the scheme, eligible equipment and application conditions.

    Your exact price, in 2 minutes

    Describe your project, receive quotes from tradespeople in Luxembourg — free, with no commitment.

    Request a free quote