Cost: timber framing and structure
Price a drawing-defined package: design, timber components, connections, transport, lifting and assembly. Identify insulation, membranes, finishes, windows and fit-out separately. Frame cost is not comparable with a completed extension.
Editorial update on 18 September 2026

Define the package precisely
Separate design, execution drawings, structural elements, bracing panels, connections and assembly. State supplied components and exclusions. For area rates specify whether wall, floor or created area is measured.
Include logistics and interfaces
Price delivery, lifting, temporary protection, access, support adaptation and junctions. Distinguish foundations, roofing, insulation, sealing, glazing and equipment. Do not label a budget all-inclusive without identifying these items.
Separate insulation from grant eligibility
The consulted Klimabonus route has building, work and procedural conditions including advice and prior approval. Insulation thickness alone therefore proves no extension entitlement. Have eligible areas and measures identified before counting support.
The three budget levels
Where your money goes
- DesignOn quotationStructure, drawings and interfaces.
- SupplyOn quotationTimber elements and connections.
- AssemblyOn quotationTransport, lifting and temporary stability.
- ProtectionOn quotationWater, checks and coordinated enclosure.
What makes the price vary
Loads
Use, spans and openings.
Existing building
Supports and connections.
Access
Delivery, lifting and storage.
Scope
Frame alone or additional trades.
Indicative scenarios
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Is this a complete extension price?
No. Distinguish the structural package from other work and equipment.
Does timber always insulate better than masonry?
Compare complete assemblies and evidenced performance, not structural material alone.
Is it always faster?
Prefabrication may organise assembly; compare full schedules including design and associated work.
Does Klimabonus depend only on U-value?
No. Check building, eligible measures, scheme and procedures before work.