MestravauxYour projects, our experts
AI

Request a quote to replace a gas boiler

E.g.: condensing gas boiler, wall-mounted boiler replacement

Request a quote to replace a gas boiler

Describe the existing boiler, the problem and your heating and hot water needs. Attach the model reference, available inspection reports and photographs accessible without dismantling anything. The enquiry supports an assessment; it does not determine which equipment to install.

Document the installation

Specify the building type, heat emitters, hot water production and planned insulation work. Ask the installer to explain the sizing and identify adaptations assessed during the visit.

Break down the replacement

Request separate items for removal, equipment, connections, flue and condensate disposal, controls and commissioning. Identify reused components, exclusions and work needing further checks.

Distinguish maintenance from inspection

Creos states that the gas installation must be inspected every four years by an authorised professional. This inspection is distinct from maintenance contract services. Request the scope, frequency and price of each proposed service.

Compare alternatives without assuming a grant

Klimabonus 2026 lists heat pumps and non-fossil hybrid systems among eligible equipment. This does not establish eligibility for a gas boiler replacement or a heat pump with gas backup. Have the specific project checked before deducting a grant from the budget.

Indicative prices in Luxembourg

On quotation

A replacement quote should identify what is retained, adapted and replaced. The boiler price alone cannot make offers comparable when connections, controls or commissioning services differ.

See the full price breakdown — ranges, cost breakdown, real examples

Subsidies and grants

Klimabonus 2026 lists heat pumps and non-fossil hybrid systems among eligible equipment. This does not establish eligibility for a gas boiler replacement or a heat pump with gas backup. Have the specific project checked before deducting a grant from the budget.

Frequently asked questions

Should the new boiler match the old output?

Request a justification based on the building and its use. The old model reference alone is not an assessment of current needs.

Can gas savings be guaranteed?

A general percentage is insufficient. Ask for consumption assumptions, operating conditions and the comparison method before including savings in your calculation.

How long will heating be unavailable?

After the site visit, have the planned interruption, conditions and any temporary arrangements specified. This page does not guarantee a replacement duration.

In the same category