Quote: pellet or biomass boiler
E.g.: pellet boiler with silo, log wood boiler

Specify proposed fuel, existing heating and space for equipment and storage. Request assessment of needs, supply and daily tasks you can undertake.
Distinguish proposed configurations
Ask about accepted fuel and model operation: loading, controls, maintenance and electrical needs. Do not assume all biomass boilers have automatic feeding or the same operating constraints.
Assess storage and delivery
Size reserves from explicit consumption and delivery assumptions. Check access, feeding routes and supplier conditions. Do not choose storage from a standard capacity assigned to every house or solely because an old tank frees space.
Check connections and maintenance
Assess heating circuit, hot water, flue and air supply. Request adaptations, maintenance tasks and inspections. AEV distinguishes maintenance and regulatory checks; no universal annual frequency is assumed here.
Check the grant scheme
Klimabonus lists and conditions depend on equipment and project. Check the model, requirements, dates and evidence. Neither the word biomass nor removal of an oil boiler alone guarantees a grant or bonus.
Indicative prices in Luxembourg
On quotation
Compare boiler, storage, feeding and connections together. Equipment-only offers cannot be compared with installations including storage and adaptations. Existing emitter compatibility needs assessment.
Subsidies and grants
Klimabonus lists and conditions depend on equipment and project. Check the model, requirements, dates and evidence. Neither the word biomass nor removal of an oil boiler alone guarantees a grant or bonus.
Frequently asked questions
Will storage last a whole season?
Check usable capacity, consumption and delivery conditions. No seasonal autonomy is guaranteed without these data.
Can every radiator be retained?
Have suitability assessed. Choosing biomass alone does not establish compatibility.
Does biomass automatically mean Klimabonus eligibility?
No. Check the exact category, model and scheme conditions on Guichet before counting a grant.