MestravauxYour projects, our experts
AI

Quote: complete electrical renovation

E.g.: complete rewiring of an old house's cabling, replacing the ducting

Quote: complete electrical renovation

Send plans, reports and planned equipment. State occupancy and other works. Define complete in the offer: renewed circuits, retained parts, finishes, checks and connection. An old installation does not automatically require the same solution everywhere.

Assess before stripping out

Creos recommends professional checks. Request reasons for retaining or replacing existing elements. Separate verified from concealed conditions; age alone is not a diagnosis.

Set uses before routes

Place appliances, fixed furniture, controls, sockets and lighting on the plan. State likely projects without inventing capacity or reserves. Have requirements checked and penetrations coordinated with building constraints.

Coordinate services, insulation and finishes

Describe routes, penetrations and reinstatement, then coordinate trades. Ask how affected wall performance is maintained. Do not cover or alter unassessed installation to meet a finishing date.

Plan occupied work

Request usable zones, outages and professionally designed temporary supplies. Confirm whether occupants can stay with necessary services. Discuss phasing before signing rather than assuming it works in every home.

Verify handover

Request suitable tests, results, labels, updated diagrams and outstanding issues. Replacement alone does not demonstrate compliance. Separate performed checks and any required network process.

Indicative prices in Luxembourg

On quotation

Compare an identical point and circuit plan with removal and reinstatement boundaries. Access, existing work and uses influence costs beyond floor area. Assume no square-metre price, standard duration or vacant-home saving.

See the full price breakdown — ranges, cost breakdown, real examples

Subsidies and grants

No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.

Frequently asked questions

Replace everything before a certain year?

Not from a date alone. Assess condition and justify scope.

Does complete include painting?

Only if quoted. Describe finishes and responsibility.

How many sockets?

Plan from use and applicable requirements; no foreign count is presented as a Luxembourg rule.

Can occupants stay?

Assess against safety, available services and occupants’ needs.

In the same category