Quote: electrical compliance work
E.g.: bringing an installation up to code before a sale, RGIE diagnostic

Provide reports, incidents and known previous work. State whether you need defect correction, preparation for a change or assessment of existing condition. Request a verified scope before accepting generic compliance wording. Floor area and age alone do not define work.
Identify professional and check
Creos directs users to an electrician authorised in Luxembourg for installation behind the meter. Define scope and documents. Do not automatically reserve every initial assessment to an independent body.
Link defects to work
Request assessed elements, measurements and inaccessible areas. Specify circuit, remedy and applicable requirements for each correction. Remark count alone determines neither seriousness nor remedy.
Separate internal and connection work
If capacity, metering or connection changes, confirm procedures with the relevant operator. Allocate responsibilities and commissioning stages. Do not describe connection checks as exhaustive internal verification.
Define completion and reservations
Include appropriate results, updated diagrams, labels, retained items and unresolved issues. For sale or rental, check case-specific requirements with competent parties; this page establishes no universal independent-inspection obligation.
Indicative prices in Luxembourg
On quotation
Link each item to findings and separate assessment, correction and completion checks. Compare retained circuits, alterations, documents and finishes equally. Assume no average cost, standard duration or property discount. Identify and price any independent inspection for the actual case.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Can an electrician assess my installation?
Creos recommends an authorised electrician for internal installation. Check any project-specific regulatory inspection requirements separately.
Does every sale require this package?
This page does not establish that. Distinguish obligations, a party’s request and advice.
Can I wait because it works?
Operation does not prove safety. Have defects and urgency professionally assessed.
Is a board change enough?
Only if the necessary scope justifies it; other elements need assessment.