Quote: whole-apartment painting
E.g.: 3-bedroom apartment to be fully repainted, coordination with other trades

Repainting a whole apartment needs one consistent brief and a coordinated sequence. Establish room access, preceding work and what complete actually includes before asking for a fixed price.
Create the room schedule
List walls, ceiling, height, condition, colour and finish for each room. Include corridors, internal stairs, cupboards and easily missed small areas. Separate doors, skirting and radiators. Identify untouched surfaces; complete does not automatically mean every element.
Specify preparation by area
Add photographs and known repairs. A recently renovated room and damaged corridor should not automatically receive identical specifications. Buildwise describes limits of thin filling for overall flatness; distinguish local repairs from wider correction before agreeing a finish.
Plan vacant or occupied work
State access date, keys and furniture to move. If staying, have circulation, sanitary access, ventilation and work-zone separation assessed. Newly painted does not automatically mean ready to occupy; follow the system's conditions. Where phasing cannot preserve essential use, arrange another solution.
Coordinate trades
Identify who completes chases, repairs, plumbing and dusty work and who accepts substrates before painting. Agree sequence, protection and subsequent touch-ups with flooring and joinery installers. Painting before flooring is not a universal sequence for every product and project.
Agree colours and handover
Record references and colour boundaries room by room after checking samples in relevant light. A palette does not guarantee a better sale. Plan a room checklist, identified touch-ups and care documents. Specify whether colour advice and samples are included.
Indicative prices in Luxembourg
On quotation
A total budget should remain readable room by room. Separate painted areas, preparation, ceilings, woodwork and organisation. Grouping work may change logistics but does not guarantee a discount. No local average is established here.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Is doing everything together always cheaper?
No. Compare combined and separate offers on the same scope.
Does complete include doors and ceilings?
Only where the specification includes them.
Can I stay in the apartment?
Assess products, ventilation, access and work-zone separation; do not assume it.
Must painting always precede flooring?
No. Coordinate products, protection and touch-ups with the trades.