Quote: home EV charging station
E.g.: 11kW wallbox in an individual garage with a dedicated meter

Specify vehicle model, usual travel, parking hours and charger location. Supply photographs of the distribution board and proposed cable route. Identify major electrical loads, any solar system and a possible second vehicle.
Match vehicle and home
Creos explains that usable power depends on vehicle, charger and connection. Estimate charging time for usual demand, not only an empty battery.
Confirm network procedures
Creos requires an application depending on power and installation by an approved electrician with an installation report. Check your address’s network operator procedure before work.
Specify actual control functions
Separate scheduling, adaptation to household load and surplus-solar charging. Request exact compatibility, metering accessories, offline behaviour and handover tests. An app does not demonstrate every function.
Plan a usable location
Check cable length, vehicle socket position, mounting, outdoor exposure and impact protection. Specify route, penetrations or trenches and reinstatement. Have the electrician select protection and commission the installation.
Treat support separately
At consultation, Guichet.lu warns that the presented 2026 legal framework has not been definitively published. Confirm the applicable scheme before including a grant in financing.
Indicative prices in Luxembourg
On quotation
Include charger, protection, wiring, electrical adaptations, route works and commissioning. Price the controls actually proposed and recurring fees. No local average or guaranteed full overnight charge is stated.
Subsidies and grants
No grant is deducted from the budget shown here. If a quote mentions support, request the exact scheme and confirmation of your eligibility before including it in financing.
Frequently asked questions
Does a more powerful charger always charge faster?
No: the vehicle and authorised power may limit charging.
Is an app enough for solar control?
Request compatible equipment and a demonstration of the proposed function.
Does the distribution board need changes?
The electrician must inspect and specify adaptations; these differ between homes.
Is support deducted already?
Request the full payable price and a separate conditional grant line.