MestravauxYour projects, our experts
AI

Post-building cleaning budgets in Luxembourg: compare offers

Published on 31 July 2026 · Verified on 19 September 2026 · The Mestravaux.lu team

A square-metre rate cannot compare post-building cleaning on its own. You need included surfaces, deposits and access arrangements. Without dated comparable quotations, we publish neither a local average nor a minimum applying to every provider.

The essentials in 30 seconds

  • Define what each charged square metre measures.
  • Separate dust, adhered deposits and existing damage.
  • Price glazing and special access explicitly.
  • Compare totals and additional-work terms.
Post-building cleaning budgets in Luxembourg: compare offers

Define quantities

Separate floor area, glass faces, sanitary fittings and installed furniture. Partial renovation does not imply equal treatment in every room. Include affected routes and specify exclusions rather than applying a single rate to the whole floor plan.

Prix constatés au Luxembourg en 2026 selon surface et état du chantier
SurfaceÉtat du chantierPrix forfaitairePrix au m²
Appartement 50 m²Rénovation légère300 – 400 €6 – 8 €
Appartement 50 m²Gros œuvre (perçage, ponçage)350 – 400 €7 – 8 €
Maison 100 m²Rénovation légère500 – 600 €5 – 6 €
Maison 100 m²Gros œuvre700 – 800 €7 – 8 €
Maison 150 m²Gros œuvre900 – 1 050 €6 – 7 €

Vitres importantes, véranda ou étage sans ascenseur : ajoutez 80 à 200 € selon la configuration.

Describe the work, not just the project

Adhesive, paint splashes and settled dust may need different methods. Mention new finishes, available instructions and unknown deposits. Confirm removal limits before accepting a result promise; scratches are not dirt to remove.

Itemise fixed charges and options

Check travel, setup, access equipment, consumables, parking and working-time terms. Confirm protective-film removal and furniture moving. No automatic percentage surcharge is assumed for urgency or upper floors; request stated charges.

Separate waste removal

AEV distinguishes construction waste categories and sorting. Specify streams, quantities, transport and destination in the relevant offer. Cleaning does not establish that all waste can be collected together or is already paid for.

Your project deserves an accurate estimate — it's free.

Request a quote

Check the charging basis

Guichet explains that consumer prices include taxes. Compare a defined package or a rate with calculation method, any minimum and approval before extra work. Add declared charges without treating the lowest price as inherently incomplete.

Compare three situations without invented invoices

A renovated kitchen needs targeted tasks and affected routes; a fully renovated house needs a room schedule; offices require hours and business continuity details. Use these situations for tailored requests, not supposedly observed prices. Agree final checks and treatment of missed tasks too.

Frequently asked questions

Which average should I use?

No verified average is published here. Request offers against one task and area schedule.

Is a square-metre rate enough?

Only with defined areas, services and associated charges.

Does a package include windows?

Check faces, frames, tracks and access explicitly.

Can I book one room only?

Request a targeted scope including affected routes and any minimum charge.

Take action

Your project deserves an accurate estimate — it's free.

Request a quote
Free quote in 2 min